Current Projects Williamson WWTP
Project Location
7901 Hamilton St Exd, Williamson, NY 14589
Owner
Town of Williamson
Engineer
MRB Group & Turner Engineering, P.C.
Project Value
$10,700,000
The following is a general description of the project:
The work includes selective demolition of existing components of raw water wet well, process piping, backwash pump, solids contact clarifier, chemical feed systems, electrical systems, and heating and ventilation systems. The work also includes construction of flood resiliency measures, raw water wet well components, freeze-up pump system, pre-engineered building addition, concrete water treatment process tankage, solids contact clarifier, filter systems with underdrains and media, process piping, filter air scour equipment, filter backwash system, upgrades to an existing solids contract clarifier, powder activated carbon feed system, chemical feed systems, coatings, building ventilation, lighting, electrical and control interconnections between the chemical feed systems, pumps, filter and clarifier control valves, and an existing plant wide SCADA system, site construction, drainage and sanitary systems, chemical containment pad, and temporary systems that may be necessary to complete the Work.