Bid Schedule

Bid Date

May 23rd at 2:00pm

Project Location

11750 Capital Lane, Fredericksburg, VA, 22408

Owner

Spotsylvania County

Engineer

Ramboll

Estimated Value

$30,000,000


The following is a general description of the project:

a. Work of this contract comprises the Project, which consists of four areas of work: the Deep Run Pump Station Conveyance Improvements, FMC Conveyance Pump Station Improvements, FMC Wastewater Treatment Plant (WWTP) Decommissioning, and Combined Force Main. b. The Deep Run Conveyance Improvements consists of demolition of structures, equipment, piping, and related material in areas of construction as specified in the technical specifications and construction drawings. The project also consists of furnishing and installing an expansion of the existing Deep Run Pump Station (PS) Control Building, modifications to the existing wet well, and construction of a new wet well. The project also includes site improvements, expansion of existing electrical power distribution, a new backup generator, improvements to existing SCADA systems, and other proposed work as delineated in the plans and specifications. c. The FMC Conveyance Improvements consists of demolition of structures, equipment, piping, and related material in areas of construction as specified in the technical specifications and construction drawings. The project also consists of furnishing and installing a new FMC Pump Station (PS) Building to house new pumps, new electrical equipment, equipment storage, a new wet well, and a new flowmeter vault. The project also includes site improvements, new electrical power distribution, a new backup generator, new SCADA systems, and other proposed work as delineated in the plans and specifications. d. The FMC WWTP Decommissioning consists of demolition of structures, equipment, piping, and related material in areas of construction as specified in the technical specifications and construction drawings. The project also includes decommissioning of the existing WWTP outfall as delineated in the plans and specifications. e. The Combined Force Main consists of a new force main beginning at the new FMC PS then travelling to a point of connection with the Deep Run PS force main. From that connection point, the combined force main alignment generally follows along Tidewater Trail toward the Massaponax Wastewater Treatment Plant (WWTP). The combined force main terminates at a connection point on the Massaponax WWTP site as shown on the plans.

Contract Documents Available Here