Current Projects East West WWTP

Bid Date

August 30th at 5:00 PM

Project Location

6831 Beaver Dam Road, Beltsville, MD

Owner

USDA

Engineer

ARRO Consulting

Estimated Value

$1,000,000- $5,000,000


The following is a general description of the project:

The work under this contract is divided into 2 areas which have been consolidated into one contract.

Work at the East WWTP includes:

  1. Upgrades to the 300-gpm Overland Flow and 850-gpm Influent Pumping Systems
  2. Installation of a 1.21 MGD grit removal system
  3. Modification of three (3) 620,000-gallon basins within the existing secondary treatment system for Enhanced Nutrient Removal (ENR)
  4. Installation of two (2) chemical storage (1,050 gallons each) and feed systems
  5. Minor electrical
  6. Concrete and site repairs/improvements.

Work at the West WWTP includes:

  1. Rehabilitation of an existing Evoqua/DAVCO treatment train
  2. Installation of a chemical storage (550 gallon) and feed system
  3. Minor electrical
  4. Minor concrete repairs

Contract Documents Available Here